Alberta Project

Primus is evaluating a methanol plant in Alberta, Canada, as very favorable feed gas vs. output price spreads draw great application.  This project would supply 160 metric tons per day of methanol to the local region through distributors to reduce hydrate formation in natural gas wells. The natural gas feedstock will come from the Montney and Duvernay shale plays in Alberta, keeping feedstock costs low and saving on transportation costs.  The affordable STG+® methanol unit will produce methanol that is cost competitive with methanol produced from mega plants in North America and around the world.